Tuesday, January 5, 2010

orinda addition

here is the exterior of the addition. still needs a little paint, but for the most part its on its way to being done.

orinda addition

interior of bathroom before the drywall and electrical.

orinda addition

the rough framing of the project.

Monday, January 4, 2010

orinda addition

The floor joists and the rough plumbing for the entire bathroom. Notice the blocked framing above the cantilevered joists to support the bathtub.

orinda addition

The sub-floor and bottom plate with rough plumbing poking through.

orinda addition

The finished slab was troweled and bottom plates were securely fastened to the slab with 8 inch bolts. the section on the lower right will be cantilevered over the concrete so the roots of the tree could be saved and not cut out.

orinda addition

The beginning of the project was to level the grade and set forms for the concrete slab. Gravel was placed as a bed and for drainage

orinda addition

the start of a master bathroom addition in orinda, california.